Welcome to

4C Document Library

  • System Documents – core policies, regulations and formal 4C documentation.
  • Supporting Documents – background materials, guidelines and reference information.
  • Tools and Templates – practical instruments to assist you in implementation.

All materials are kept up to date to reflect the latest revisions and insights in sustainability, compliance and supply‑chain standards.

System Updates

2025

  • System Update 17
    • Relevant Points:
      • Clarification of Traceability Requirements
      • Implementation Guidelines of the Registration of Business Partner (BP)
        Producer in only one 4C Unit

2024

  • System Update 16
    • Relevant Points:
      • Roll out of the revised 4C Code of Conduct, v.4.1
      • Update on the BPM and 4C Audit Checklist, v.4.1, for Coffee Production (4C Units)
      • Roll out of the Regulation for 4C certified EUDR Coffee, v.1.0
      • Adjustment of the 4C requirements on the single registration of a Business. Partner producer in one 4C Unit
      • Roll out of the new 4C Guidelines for Geodata Collection v.1.0

2023

  • System Update 15
    • Relevant Points:
      • Update on the BPM and Audit Checklist for Chain of Custody certification
      • Clarification on the proper completion of the BPM template for 4C Units
      • Clarification on the proper completion of the Audit Report template
      • Clarification on the CB infringement solving process

2022

  • System Update 14
    • Clarification on Addendum Audits and possibility of combining Addendum and Surveillance Audit:
      • Clarification on Addendum Audit
      • Clarification on combining Addendum and Surveillance Audit
  • System Update 13
    • Relevant Points:
      • Clarification on type and level of infringements of the Certification Body and related sanctions
  • System Update 12
    • Relevant Points:
      • Clarification on Guidance for Remote Audits
      • Clarification on Procedures for the 4C Chain of Custody (CoC) Certification and the Use of the Mass Balance Traceability Modality by FBs

2021

  • System Update 11
    • Relevant Points:
      • Clarification on Procedures for the 4C Chain of Custody (CoC) Certification
  • System Update 10
    • Relevant Points:
      • End of Transition Rules communicated in the framework of introducing the new System Regulations
      • Sample calculation of BP Service Providers
      • Clarification: Geographical scope not required for Chain of Custody (CoC) certification
      • Replacement Terms of Use for Intermediary Buyers (ToU IBs) through the Terms of Use for Intermediary Buyers and Buyers of Processed Coffee (ToU IBs and BPCs)
  • System Update 9
    • Relevant Points:
      • Remote audit guidance
      • Clarification: Possibility of merging audits
  • System Update 8
    • Relevant Points:
      • Business Partners Traders licensed by the Managing Entity to sell 4C certified coffee to First Buyers
      • Clarification on the deadlines for submission and approval of Annual Update documents
      • Translation of relevant 4C System Documents and audit checklist

2020

  • System Update 7
    • Relevant Points:
      • Important notification on exceptions due to Corona virus
      • Mandatory contact update via the 4C portal
      • Clarification on forming new 4C Units with old Business Partners (BPs)
      • Translation of documents
      • Transition period for the new 4C System requirements
      • 4C Online-Trainings 2020
  • System Update 6
    • Relevant Points:
      • Roll Out of the New 4C System Documents: Finalized and Available Online
  • System Update 5
    • Relevant Points:
      • Phase out of the Rainforest Alliance (RA) certificate recognition
      • Reminder: Survey on 4C impact
      • Audit checklist translations
      • Addition: Important notification on exceptions due to Corona virus
  • System Update 4
    • Relevant Points:
      • Important notification on exceptions due to Corona virus
      • 4C includes glyphosate into the 4C Yellow Pesticide List
      • 4C Classified Chemicals tool
      • Use of the new BPM functions in the 4C portal
      • 4C impact survey for Certification Bodies and Managing Entities
  • System Update 3
    • Relevant Points:
      • New BPM template 3.6 published
      • Updated 4C portal views
      • Use of the GRAS tool for risk-based sample calculation
      • Extension of the transition period on the clearance of non-conformities

2019

  • System Update 2
    • Relevant Points:
      • Clarification: 4C audit report – Which cycle to use in a recertification audit
      • Non-conformities identified in previous audits
      • Completeness and correctness of BPM data
      • Use of old versions of the 4C logo
  • System Update 1
    • Relevant Points:
      • 4C system updates
      • New 4C procedure: Which cycle to use for the recertification audit?
      • In case of new BPs joining a 4C unit or a break between two certification cycles, which cycle should be used for recertification?
      • Revision of 4C audit report
      • Multiple producers cultivating and selling coffee from the same plot: How to register this in the BPM
      • Availability of geo-coordinates of BPs in the BPM
      • Obligation to participate in a 4C training